TSX:SVM   CAD$ 4.39 +0.12
 

Overview


Silvercorp Production Summary FY2008-FY2016

  Fiscal 2016 Fiscal 2015 Fiscal 2014 Fiscal 2013 Fiscal 2012 Fiscal 2011 Fiscal 2010 Fiscal 2009 Fiscal 2008
Silver (millions of ounces) 5.03 5.12 3.86 4.97 5.60 5.30 4.60 4.20 4.00
Gold (ounces) 2,400 5,900 11,100 12,457 8,800 3,200 1,600 1,880 2,152
Lead (millions of pounds) 52.5 51.5 37.2 53.9 72.8 69.0 62.4 53.1 49.6
Zinc (millions of pounds) 17.5 15.9 8.4 12.4 13.7 16.3 14.7 13.0 15.9

Fiscal Year ends March 31st

Summary of Silver Resources1,2,3,4 (See table 14.1 for further details)

Project
Reserve Category
Tonnes
(Million)
Head Grades
Contained Metal Resources
(Inclusive of Reserves)
Ag (g/t)
Pb (%)
Zn (%)
Ag (Moz)
Pb (t)
Zn (t)
Ying Mining District
Measured
5.91
266
4.36
1.64
50.55
257,600
96,690
Indicated
10.40
233
3.59
1.13
77.76
373,000
117,660
Inferred
10.47
230
3.91
1.10
77.25
409,400
115,220
GC Project
Measured
0.59
230
1.41
3.33
4.40
8,400
19,800
Indicated
7.04
113
1.31
3.06
25.6
92,500
215,500
Inferred
7.96
123
1.41
2.66
31.4
112,500
211,900
Consolidated
Measured
6.50
 
 
 
54.95
266,000
116,490
Indicated
17.44
 
 
 
103.36
465,500
333,160
Inferred
18.43
 
 
 
108.65
521,900
327,120
  1. Table excludes HPG mine Measured  resources of 24,000 oz Au (690,000 tonnes grading 1.10 g/t Au), Indicated resources of 22,000 oz Au (630,000 tonnes grading 1.10 g/t  Au), Inferred resources of 39,000 oz Au (1,010,000 tonnes grading 1.21 g/t Au). Table also excludes BYP Au-Pb-Zn project resources
  2. For further information please refer to the revised Technical Report for Ying gold-Silver-Lead-Zinc Property (to be filed February 24, 2017) and the GC Technical Report (filed February 2012). All reports are available on SEDAR (www.sedar.com)
  3. Rounding of some figures may lead to minor discrepancies in some totals
  4. Resources are inclusive of resources converted in mineral reserves

 

Summary of Silver Reserves1,2,3,4 (See table 15.4 for further details)

Project
Reserve Category
Tonnes
(Million)
Head Grades
Contained Metal Reserves
Ag (g/t)
Pb (%)
Zn (%)
Ag (Moz)
Pb (t)
Zn (t)
Ying Mining District
Proven
4.67
252
4.15
1.55
37.85
193,950
72,240
Probable
7.63
233
3.50
1.09
57.16
267,010
83,450
GC Project
Proven
0.46
199
1.12
3.18
3.0
5,200
14,800
Probable
4.29
113
1.33
2.93
15.5
56,900
125,500
Consolidated
Proven
5.13
 
 
 
40.85
199,150
87,040
Probable
11.92
 
 
 
72.66
323,910
208,950
Total Proven Plus Probable
17.05
 
 
 
113.51
523,060
295,990
  1. Table  excludes HPG mine Proven reserves of 16,430 oz Au (470,000 tonnes grading 1.10 g/t Au)  and  HPG mine Probable reserves of 10,840 oz Au (290,000 tonnes grading 1.15 g/t Au)
  2. For further information please refer to the Technical Report for Ying Gold-Silver-Lead-Zinc Property (filed February 24, 2017) and the GC Technical Report (filed February 2012). All reports are available on SEDAR (www.sedar.com)
  3. Rounding of some figures may lead to minor discrepancies in some totals
  4. Mineral reserves include consideration of mining dilution

Last updated March 3 2017

Home  |  Company  |  Projects  |  News  |  Financials  |  Governance  |  Investors  |  Careers  |  Contact Us
Silvertip Project Ying Mining District BYP Mine GC & SMT XBG + XHP Projects